|
|
|
60 Gallon Portable System (Standard Configuration)
|
|
|
|
Global Defender Trailer
|
|
|
|
Combination Trailer System (Portable and Fixed Systems)
|
|
|
|
Inside Combinatin Trailer System
|
|
|
|
Loading Portable Cart System into Trailer
|
|
|
|
|
Fixed Trailer System Interior
|
|
|
|
Trailer Storage Containers
|
|
|
|
Trailer Pump System
|
|
|
|
Portable System Deployed on Pipe Bomb
|
|
|
|
60 Gallon Portable System (Alternate Configuration)
|
|
|
|
|
60 Gallon Portable System (Alternate configuration)
|
|
|
|
SUV Portable System in Transport
|
|
|
|
ATV Mounted System
|
|
|
|
Pipe Bomb Placement in Vehicle
|
|
|
|
Vehicle Pipe Bomb Damage. No Mitigation.
|
|
|
|
|
Vehicle Pipe Bomb Mitigated with Global Defender. Minimal Damage
|
|
|
|
Vehicle Pipe Bomb Damage. No Mitigation. Vehicle Destroyed
|
|
|
|
Vehicle Pipe Bomb Mitigated with Global Defender System. Minimal Damage
|
|
|
|
Dispersible Agent Demonstration Shot. No Mitigation.
|
|
|
|
Dispersible Agent Shot Mitigated with Global Defender
|
|
|
|
|
Enclosure in Place prior to Remote Filling Activation
|
|
|
|
Filled Enclosure Prior to Shot
|
|
|
|
IEDD Demonstration Shot. 5 Sticks Dynamite in Ice Chest
|
|
|
|
PAN Disruptor in Place as Enclosure Fills
|
|
|
|
Perforator Counter Charge in Place Prior to Covering Device
|
|
|
|
|
Large Pipe Bomb Mitigated with Global Defender System
|
|
|
|
Raytheon Trade Show Display
|
|
|
|
Omaha, Nebraska Bomb Squad takes delivery of their Combination Trailer/ Portable systems
|
|
|
|
On-site, Hands-on training provided to Omaha Bomb Sqaud
|
|
|
|
On-site training
|
|
|